S. Albers, Energy-efficient algorithms, Communications of the ACM, vol.53, issue.5, pp.86-96, 2010.
DOI : 10.1145/1735223.1735245

C. Artigues and P. Lopez, Energetic reasoning for energy-constrained scheduling with a continuous resource, Journal of Scheduling, vol.48, issue.2, pp.225-241, 2015.
DOI : 10.1007/s10951-014-0404-y

URL : https://hal.archives-ouvertes.fr/hal-01108964

C. Artigues, P. Lopez, and A. Ha¨?tha¨?t, The energy scheduling problem: Industrial case-study and constraint propagation techniques, International Journal of Production Economics, vol.143, issue.1, pp.13-23, 2013.
DOI : 10.1016/j.ijpe.2010.09.030

URL : https://hal.archives-ouvertes.fr/hal-00522387

J. Bb-la?-zewicz, K. H. Ecker, E. Pesch, G. Schmidt, and J. W¸eglarzw¸eglarz, Scheduling computer and manufacturing processes, 2001.

J. Bb-la?-zewicz, K. H. Ecker, E. Pesch, G. Schmidt, and J. W¸eglarzw¸eglarz, Handbook on Scheduling: From Theory to Applications, 2007.

J. Bb-la?-zewicz, M. Machowiak, J. W¸eglarzw¸eglarz, M. Kovalyov, and D. Trystram, Scheduling malleable tasks on parallel processors to minimize the makespan, Annals of Operations Research, vol.129, pp.1-465, 2004.

A. Borghetti, C. D. Ambrosio, A. Lodi, and S. Martello, An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir, IEEE Transactions on Power Systems, vol.23, issue.3, pp.1115-1124, 2008.
DOI : 10.1109/TPWRS.2008.926704

E. Camponogara, M. P. De-castro, and A. Plucenio, Compressor Scheduling in Oil Fields: A Piecewise-Linear Formulation, 2007 IEEE International Conference on Automation Science and Engineering, pp.436-441, 2007.
DOI : 10.1109/COASE.2007.4341706

R. Carli and M. Dotoli, Energy scheduling of a smart home under nonlinear pricing, 53rd IEEE Conference on Decision and Control, pp.5648-5653, 2014.
DOI : 10.1109/CDC.2014.7040273

J. Chang, S. Khuller, and K. Mukherjee, LP rounding and combinatorial algorithms for minimizing active and busy time, Proceedings of the 26th ACM symposium on Parallelism in algorithms and architectures, SPAA '14, pp.118-127, 2014.
DOI : 10.1145/2612669.2612689

Y. Gaoua, S. Caux, and P. Lopez, A combinatorial optimization approach for the electrical energy management in a multi-source system, International Conference on Operations Research and Enterprise Systems (ICORES), pp.55-59, 2013.
URL : https://hal.archives-ouvertes.fr/hal-00837830

M. Guemri, S. Caux, and S. U. Ngueveu, Using Quasi-Newton method for energy management in electrical multi source systems, 2012 11th International Conference on Environment and Electrical Engineering, pp.194-199, 2012.
DOI : 10.1109/EEEIC.2012.6221572

M. Guemri, S. Caux, S. U. Ngueveu, and F. Messine, Heuristics and lower bound for energy management in hybrid-electric vehicles, 9th International Conference on Modeling, Optimization & SIMulation (MOSIM), 2012.
URL : https://hal.archives-ouvertes.fr/hal-00728563

A. Ha¨?tha¨?t and C. Artigues, A hybrid CP/MILP method for scheduling with energy costs, European J. of Industrial Engineering, vol.5, issue.4, pp.471-489, 2011.
DOI : 10.1504/EJIE.2011.042742

J. Józefowska, M. Mika, R. Ró?-zycki, G. Waligóra, and J. W¸eglarzw¸eglarz, Project Scheduling under Discrete and Continuous Resources, Project Scheduling: Recent Models, Algorithms, and Applications, pp.289-308, 1999.
DOI : 10.1007/978-1-4615-5533-9_13

T. Kis, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Mathematical Programming, vol.136, issue.3, pp.515-539, 2005.
DOI : 10.1007/s10107-004-0551-6

O. L. Mangasarian, J. B. Rosen, and M. E. Thompson, Global Minimization via Piecewise-Linear Underestimation, Journal of Global Optimization, vol.17, issue.6, pp.1-9, 2005.
DOI : 10.1007/s10898-004-5907-1

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.485.208

A. Mingozzi, V. Maniezzo, S. Ricciardelli, and L. Bianco, An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation, Management Science, vol.44, issue.5, pp.714-729, 1998.
DOI : 10.1287/mnsc.44.5.714

M. Nattaf, C. Artigues, and P. Lopez, A hybrid exact method for a scheduling problem with a continuous resource and energy constraints, Constraints, vol.208, issue.1, pp.303-324, 2015.
DOI : 10.1007/s10601-015-9192-z

URL : https://hal.archives-ouvertes.fr/hal-01163561

M. Nattaf, C. Artigues, P. Lopez, and D. Rivreau, Energetic reasoning and mixedinteger linear programming for scheduling with a continuous resource and linear efficiency functions
URL : https://hal.archives-ouvertes.fr/hal-01234466

S. U. Ngueveu, B. Sareni, and X. Roboam, Piece-wise bounding and integer linear programming for the optimal management of a water pumping and desalination process, 2014.

F. Shrouf, J. Ordieres-meré, A. García-sánchez, and M. Ortega-mier, Optimizing the production scheduling of a single machine to minimize total energy consumption costs, Journal of Cleaner Production, vol.67, pp.197-207, 2014.
DOI : 10.1016/j.jclepro.2013.12.024

J. W¸eglarzw¸eglarz, J. Józefowska, M. Mika, and G. Waligóra, Project scheduling with finite or infinite number of activity processing modes ??? A survey, European Journal of Operational Research, vol.208, issue.3, pp.177-205, 2009.
DOI : 10.1016/j.ejor.2010.03.037

C. Woo, P. Sreedharan, J. Hargreaves, F. Kahrl, J. Wang et al., A review of electricity product differentiation, Applied Energy, vol.114, pp.262-272, 2014.
DOI : 10.1016/j.apenergy.2013.09.070