C. Artigues, P. Lopez, and A. Ha¨?tha¨?t, The energy scheduling problem: Industrial case-study and constraint propagation techniques, International Journal of Production Economics, vol.143, issue.1, pp.13-23, 2013.
DOI : 10.1016/j.ijpe.2010.09.030

URL : https://hal.archives-ouvertes.fr/hal-00522387

C. Artigues and P. Lopez, Energetic reasoning for energy-constrained scheduling with a continuous resource, Journal of Scheduling, vol.48, issue.2, pp.10-1007
DOI : 10.1007/s10951-014-0404-y

URL : https://hal.archives-ouvertes.fr/hal-01108964

P. Baptiste, C. L. Pape, and W. Nuijten, Constraint-based scheduling, 2001.
DOI : 10.1007/978-1-4615-1479-4

URL : https://hal.archives-ouvertes.fr/inria-00123562

J. B?a?-zewicz, K. H. Ecker, E. Pesch, G. Schmidt, and J. We¸glarzwe¸glarz, Scheduling computer and manufacturing processes, 2001.

J. B?a?-zewicz, M. Machowiak, J. We¸glarzwe¸glarz, M. Kovalyov, and D. Trystram, Scheduling malleable tasks on parallel processors to minimize the makespan, Annals of Operations Research, vol.129, pp.1-4, 2004.

J. L. Bentley and T. A. Ottmann, Algorithms for Reporting and Counting Geometric Intersections, IEEE Transactions on Computers, vol.28, issue.9, pp.643-647, 1979.
DOI : 10.1109/TC.1979.1675432

URL : http://www.dtic.mil/get-tr-doc/pdf?AD=ADA058768

J. Carlier and B. Latapie, Une méthode arborescente pour résoudre lesprobì emes cumulatifs, RAIRO. Recherche opérationnelle, vol.25, issue.3, pp.311-340, 1991.
DOI : 10.1051/ro/1991250303111

A. Derrien and T. Petit, A New Characterization of Relevant Intervals for Energetic Reasoning, Lecture Notes in Computer Science, vol.8656, pp.289-297, 2014.
DOI : 10.1007/978-3-319-10428-7_22

URL : https://hal.archives-ouvertes.fr/hal-01084436

C. Fündeling and N. Trautmann, A priority-rule method for project scheduling with work-content constraints, European Journal of Operational Research, vol.203, issue.3, pp.568-574, 2010.
DOI : 10.1016/j.ejor.2009.09.019

J. Erschler and P. Lopez, Energy-based approach for task scheduling under time and resources constraints, 2nd International Workshop on Project Management and Scheduling, pp.115-121, 1990.

J. Józefowska, M. Mika, R. Ró?-zycki, G. Waligóra, and J. We¸glarzwe¸glarz, Project Scheduling under Discrete and Continuous Resources, Project Scheduling: Recent Models, Algorithms , and Applications, pp.289-308, 1999.
DOI : 10.1007/978-1-4615-5533-9_13

T. Kis, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Mathematical Programming, vol.136, issue.3, pp.515-539, 2005.
DOI : 10.1007/s10107-004-0551-6

O. Koné, C. Artigues, P. Lopez, and M. Mongeau, Event-based MILP models for resource-constrained project scheduling problems, Computers & Operations Research, vol.38, issue.1, pp.3-13, 2011.
DOI : 10.1016/j.cor.2009.12.011

A. Naber and R. Kolisch, MIP models for resource-constrained project scheduling with flexible resource profiles, European Journal of Operational Research, vol.239, issue.2, pp.335-348, 2014.
DOI : 10.1016/j.ejor.2014.05.036

A. Naber and R. Kolisch, A continuous time model for the resource-constrained project scheduling with flexible resource profiles, Proceedings of the 14th International Conference on Project Management and Scheduling, pp.166-168, 2014.

M. Nattaf, C. Artigues, and P. Lopez, A polynomial satisfiability test using energetic reasoning for energy constraint scheduling, 14th International Workshop on Project Management and Scheduling, pp.169-172, 2014.
URL : https://hal.archives-ouvertes.fr/hal-00978706

M. Nattaf, C. Artigues, and P. Lopez, A hybrid exact method for a scheduling problem with a continuous resource and energy constraints, Constraints, vol.208, issue.1, pp.304-324, 2015.
DOI : 10.1007/s10601-015-9192-z

URL : https://hal.archives-ouvertes.fr/hal-01163561

C. Schwindt, Resource allocation in project management, 2005.

J. We¸glarzwe¸glarz, J. Józefowska, M. Mika, and G. Waligóra, Project scheduling with finite or infinite number of activity processing modes ??? A survey, European Journal of Operational Research, vol.208, issue.3, pp.177-205, 2009.
DOI : 10.1016/j.ejor.2010.03.037