C. Artigues, P. Lopez, and A. Ha¨?tha¨?t, The energy scheduling problem: Industrial case-study and constraint propagation techniques, International Journal of Production Economics, vol.143, issue.1, pp.13-23, 2013.
DOI : 10.1016/j.ijpe.2010.09.030

URL : https://hal.archives-ouvertes.fr/hal-00522387

C. Artigues and P. Lopez, Energetic reasoning for energy-constrained scheduling with a continuous resource, Journal of Scheduling, vol.48, issue.2, pp.225-241, 2014.
DOI : 10.1007/s10951-014-0404-y

URL : https://hal.archives-ouvertes.fr/hal-01108964

J. Bb-la?-zewicz, K. H. Ecker, E. Pesch, G. Schmidt, and J. W¸eglarzw¸eglarz, Scheduling computer and manufacturing processes, 2001.

J. Józefowska, M. Mika, R. Ró?-zycki, G. Waligóra, and J. W¸eglarzw¸eglarz, Project Scheduling under Discrete and Continuous Resources, Project Scheduling: Recent Models, Algorithms, and Applications, pp.289-308, 1999.
DOI : 10.1007/978-1-4615-5533-9_13

M. Nattaf, C. Artigues, P. Lopez, and D. Rivreau, Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions, OR Spectrum, vol.208, issue.3, pp.1-34, 2015.
DOI : 10.1007/s00291-015-0423-x

URL : https://hal.archives-ouvertes.fr/hal-01234466

J. W¸eglarzw¸eglarz, J. Józefowska, M. Mika, and G. Waligóra, Project scheduling with finite or infinite number of activity processing modes ??? A survey, European Journal of Operational Research, vol.208, issue.3, pp.177-205, 2009.
DOI : 10.1016/j.ejor.2010.03.037

J. Bb-la?-zewicz, M. Machowiak, J. W¸eglarzw¸eglarz, M. Kovalyov, and D. Trystram, Scheduling malleable tasks on parallel processors to minimize the makespan, Annals of Operations Research, vol.129, pp.1-4, 2004.

C. Fündeling and N. Trautmann, A priority-rule method for project scheduling with work-content constraints, European Journal of Operational Research, vol.203, issue.3, pp.568-574, 2010.
DOI : 10.1016/j.ejor.2009.09.019

T. Kis, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Mathematical Programming, vol.136, issue.3, pp.515-539, 2005.
DOI : 10.1007/s10107-004-0551-6

O. Koné, C. Artigues, P. Lopez, and M. Mongeau, Event-based MILP models for resource-constrained project scheduling problems, Computers & Operations Research, vol.38, issue.1, pp.3-13, 2011.
DOI : 10.1016/j.cor.2009.12.011

A. Naber and R. Kolisch, MIP models for resource-constrained project scheduling with flexible resource profiles, European Journal of Operational Research, vol.239, issue.2, pp.335-348, 2014.
DOI : 10.1016/j.ejor.2014.05.036

A. Naber and R. Kolisch, A continuous time model for the resource-constrained project scheduling with flexible resource profiles, Proceedings of the 14th International Conference on Project Management and Scheduling, pp.166-168, 2014.

C. Schwindt, Resource allocation in project management, 2005.