J. H. Holland, Genetic algorithms, Scientific American, vol.267, issue.1, pp.66-73, 1992.

E. Cantú-paz, A survey of parallel genetic algorithms. Calculateurs paralleles, reseaux et systems repartis, vol.10, pp.141-171, 1998.

A. Somani and D. P. Singh, Parallel Genetic Algorithm for solving Job-Shop Scheduling Problem Using Topological sort, Advances in Engineering and Technology Research (ICAETR), 2014 International Conference on, pp.1-8, 2014.

S. C. Lin, E. D. Goodman, and W. F. Punch, Investigating parallel genetic algorithms on job shop scheduling problems, International Conference on Evolutionary Programming, pp.383-393, 1997.

B. J. Park, H. R. Choi, and H. S. Kim, A hybrid genetic algorithm for the job shop scheduling problems, Computers & industrial engineering, vol.45, issue.4, pp.597-613, 2003.

. Nvidia, , 2017.

A. Munawar, M. Wahib, M. Munetomo, and K. Akama, Hybrid of genetic algorithm and local search to solve MAX-SAT problem using Nvidia CUDA framework, Genetic Programming and Evolvable Machines, vol.10, issue.4, p.391, 2009.

V. Boyer and D. Baz, Recent advances on GPU computing in operations research, Parallel and Distributed Processing Symposium Workshops & PhD Forum (IPDPSW), pp.1778-1787, 2013.
URL : https://hal.archives-ouvertes.fr/hal-01151607

M. Akhshabi, J. Haddadnia, and M. Akhshabi, Solving flow shop scheduling problem using a parallel genetic algorithm, Procedia Technology, vol.1, pp.351-355, 2012.

H. Tamaki, A paralleled genetic algorithm based on a neighborhood model and its application to the jobshop scheduling. Parallel Problem Solving from, Nature, vol.2, pp.573-582, 1992.

S. B. Ghosn, F. Drouby, and H. M. Harmanani, A parallel genetic algorithm for the open-shop scheduling problem using deterministic and random moves, Int. J. Artif. Intell, vol.14, issue.1, pp.130-144, 2016.

P. Pospichal, J. Jaros, and J. Schwarz, Parallel genetic algorithm on the CUDA architecture, European conference on the applications of evolutionary computation, pp.442-451, 2010.

S. Zhang and Z. He, Implementation of parallel genetic algorithm based on CUDA, International Symposium on Intelligence Computation and Applications, pp.24-30, 2009.

A. Aitzai, M. Boudhar, and A. Dabah, Parallel CPU and GPU computations to solve the job shop scheduling problem with blocking, 2013.

T. Zaj?cek and P. ?ucha, Accelerating a Flow Shop Scheduling Algorithm on the GPU. eraerts, p.143, 2011.

A. A. Bruzzone, D. Anghinolfi, M. Paolucci, and F. Tonelli, Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops, CIRP Annals-Manufacturing Technology, vol.61, issue.1, pp.459-462, 2012.

B. Plazolles, D. El-baz, M. Spel, V. Rivola, and P. Gegout, , 2017.

. Simd-monte-carlo, Numerical Simulations Accelerated on GPU and Xeon Phi, International Journal of Parallel Programming, pp.1-23

U. Kohlmorgen, H. Schmeck, and K. Haase, Experiences with fine-grainedparallel genetic algorithms, Annals of Operations Research, vol.90, pp.203-219, 1999.